CHEMISTRY AND PETROCHEMISTRY

LyondellBasell Wesseling

2012: Large TÜV inspection of the Steamcracker facility „OM6“ – Replacement of equipment, cleaning of filters and heat exchangers, replacement of pipes and piping armatures, assembling and dismantling of spectacle blinds, armatures, measuring instruments, opening and closure of devices (columns, tanks, heat exchangers, filters), pressure testing of devices and pipelines; dismantling, production and assembling of pipe circuits.

2006: Large TÜV inspection of the Steamcracker facility „OM4“ – Replacement of equipment, cleaning of filters and heat exchangers, replacement of pipes and piping armatures, assembling and dismantling of spectacle blinds, armatures, measuring instruments, opening and closure of devices (columns, tanks, heat exchangers, filters), pressure testing of devices and pipelines; dismantling, production and assembling of pipe spools.