CHEMISTRY AND PETROCHEMISTRY

Şişecam Soda Lukavac d.o.o.

2010: works on the installation of calcinators and pipelines – new calcination facility.

Installation of a Ø3600x33,3m calcinator with 52094.35 kg mass on concrete foundations. Installation of the calcinator facility and other relevant equipment and startup of the calcinator. Assembling of piping bracings and pipelines (steam of 33 Bar pressure, water pipelines and other facility media) required for the work of the calcination facility and startup of all pipelines.