CHEMISTRY AND PETROCHEMISTRY

Chemistry and Petrochemistry

Dormagen Chemical Park

2007-2012 – Construction of new production facilities, maintenance, overhauls (CR-Betrieb, Steam-Cracker).

Chemistry and Petrochemistry

Krefeld-Uerdingen Chemical Park

2006-2012 – Construction of new production facilities (Menthol Anlage, Formalin Anlage), maintenance, overhauls (Fenol-Anlage)

Chemistry and Petrochemistry

BASF SE Ludwigshafen

1994-2011 Construction of new production facilities (Mesy Project, ), maintenance, overhauls (Steamcracker, Metanolanlage, Etilenanlage, Ammoniakanlage, Synthesegasleitungen).

Chemistry and Petrochemistry

BP Gelsenkirchen-Scholven

2007 –GOFER Project (Gelsenkirchen Olefin Furnaces Environmental Revamp) Manufacturing and assembling of 7 new cracking furnaces of individual mass of 2600 t and 70 m height.

Chemistry and Petrochemistry

BP Gelsenkirchen-Horst

April-May 2012 – Overhaul of the Coker BA-101 furnace. Replacement of „Strahlungszonecoils“ of 114,3 x 6,35 mm pipes, material 1.4550. Welding with nickel alloy wire Nicro 82.

Chemistry and Petrochemistry

DOW Olefinverbund GmbH Werk Böhlen

2012, 2010, 2007, 2004: Repair works on the facilities Ethylenspaltanlage, Anilin, HCR, Aromaten, EBSM, Butex. Replacement of equipment, cleaning of filters and heat exchangers, replacement of pipes and piping armatures.

Chemistry and Petrochemistry

DOW Olefinverbund GmbH Werk Schkopau

2012: Repair works on the facilities: Kiln, Styron. Replacement of equipment, cleaning of filters and heat exchangers, replacement of pipes and piping armatures.

Chemistry and Petrochemistry

BASF Schwarzheide

2009: Construction of a new facility, BAS 500 project – assembling of devices, equipment, steel construction, piping armature and connection pipelines. 2011: Overhaul of PBT facilities.

Chemistry and Petrochemistry

SKW Piesteritz

2011: Connection of new tanks of liquid chemical fertilizers, installation of components, measuring and regulation equipment; 2010: Overhaul of ammonium and carbamide facilities. 2010: Overhaul of ammonium and carbamide facilities.

Chemistry and Petrochemistry

Leuna-Harze

2011: 2010-2011: Construction of entire epichlorohydrin facility. Assembling of devices, equipment, steel constructions, piping armature and connective pipelines.

Chemistry and Petrochemistry

Lanxsess Bitterfeld

2010-2011: Construction of a new facility for membrane filtration of water with laboratories. Assembling of devices, equipment, steel constructions, piping armature and connective pipelines.

Chemistry and Petrochemistry

Chemie- und Industriepark Zeitz

2008: Construction of starch factory (Stärkefabrik), Hylube II Project - Assembling of devices, equipment, steel constructions, piping armature and connective pipelines.

Chemistry and Petrochemistry

Bitterfeld Chemical Park

2008: Assembling of a facility for production of solar silicon - Assembling of devices, equipment, steel constructions, piping armature and connective pipelines.

Chemistry and Petrochemistry

TOTAL Raffinerie am Chemiestandort Leuna

2011: Large overhaul of nine facilities of the refinery – replacement of catalysts. Replacement of equipment, cleaning of filters and heat exchangers, replacement of pipes and piping armatures, welding of precious steel and nickel.

Chemistry and Petrochemistry

MiRO Mineraloelraffinerie Oberrhein GmbH & Co. KG Karlsruhe

2010: Large TÜV inspection of processing facilities of the refinery in „Werkteil 1“. Replacement of the column head for distillation of crude oil, opening of components and preparation for the inspection, replacement, cleaning, repair and reinstallation.

Chemistry and Petrochemistry

LyondellBasell Wesseling

2012: Large TÜV inspection of the Steamcracker facility „OM6“ – Replacement of equipment, cleaning of filters and heat exchangers, replacement of pipes and piping armatures, assembling and dismantling of spectacle blinds, armatures, measuring instruments, opening and closure of devices, pressure testing of devices and pipelines; dismantling, production and assembling of pipe circuits.

Chemistry and Petrochemistry

WACKER Chemie AG Nünchritz

2010-2011: Poly 9 Project: Installation of the facilities for production of pure polycrystalline silicon (Produktion von polykristallinem Reinstsilicium): assembling of devices, components, measuring instruments and connective pipelines.

Chemistry and Petrochemistry

Schmid Silicon Technology GmbH Schwarze Pumpe

2010-2011: Assembling of facilities for the production of solar polysilicon - assembling of devices, components, measuring instruments and connective pipelines.

Chemistry and Petrochemistry

Sasol-Huntsman Moers

2010: Installation of the production facilities of maleic anhydride (Maleinsäureanhydrid-MSA), Project: „MSA 2nd train“ - assembling of devices, components, measuring instruments and connective pipelines.

Chemistry and Petrochemistry

Şişecam Soda Lukavac d.o.o.

2010: works on the installation of calcinators and pipelines – new calcination facility.

Chemistry and Petrochemistry

Natron Hayat Maglaj

2012: The system uses heat from waste water – heat in the exchanger is taken over by cold water, which enters the boiler.

Hemija i Petrohemija

BASF Ludwigshafen

2013: Works on the construction of facilities for fungicide production -Xemium.