INDUSTRIAL SUPPLY WITH MEDIA

INDUSTRIAL SUPPLY WITH MEDIA

Praxair Hürth

June 2010 – April 2011: Construction of new facilities for process gas of 1800 t/day capacity. Assembling of components, devices and pipelines with steel construction.

INDUSTRIAL SUPPLY WITH MEDIA

Linde Gas Dusiburg

March – August 2011t: Construction of new facilities for air separation LZA 11, capacity 1500 t per day (1500 tpd).

INDUSTRIAL SUPPLY WITH MEDIA

Daimler Rastatt, Daimler Sindelfingen, Daimler Unterturkheim,
Daimler Mettingen

2002-2008: Production and assembling of complete heating cooling system and distribution of industrial media.

INDUSTRIAL SUPPLY WITH MEDIA

Gradina Hospital in Tuzla

2009-2010:Connecting Clinical Centre of Gradina to the district heating network

INDUSTRIAL SUPPLY WITH MEDIA

Bilješevo gas pipeline - hot tap

2010: Displacement of a part of the gas pipeline without gas flow disruption (T.D. Williamson’ technology „Hot Tapping and Plugging“).

Vitezit - Vitez

2010: Delivery and assembling of a container boiler for quick production of steam in Vitezit.

Arcelor Mittal Zenica

2009: Arcelor Mittal Zenica – argon distribution at a converter – ordered by RHI AG Austria.

Volkswagen Sarajevo

2004: Volkswagen Sarajevo – Repair of the 3a Volkswagen Sarajevo hall, dismantling of a pipeline, assembling of a pipeline DN150 - DN50 at 7000 m length.