PRODUCTION OF STEEL CONSTRUCTIONS, DEVICES AND PIPE SPOOLS

PRODUCTION OF STEEL CONSTRUCTIONS, DEVICES AND PIPE SPOOLS

Production and assembling of a limekiln

2011: Sisecam soda Lukavac – production and assembling of the limekiln No. 6
2010: Sisecam soda Lukavac – production and assembling of the limekiln No.1

PRODUCTION OF STEEL CONSTRUCTIONS, DEVICES AND PIPE SPOOLS

Construction of heat exchanger for the Theramal Power Plant of Kakanj

Low pressure heater: heater’s mass - 5800 kg. Test hydraulic pressure: Chamber with pipes- 42 bar cloak with dished heads: 9 bar. Projected temperature: chamber with pipes: 123 °C cloak with dished heads: 200 °C

PRODUCTION OF STEEL CONSTRUCTIONS, DEVICES AND PIPE SPOOLS

Natron Maglaj

2006-2007: Production and assembling of a steel construction for the cutting facilities hall, total mass of 160 t for "Natron Hayat" Maglaj.

PRODUCTION OF STEEL CONSTRUCTIONS, DEVICES AND PIPE SPOOLS

Natron Hayat Maglaj

Production and assembling of a reservoir: „Decanters of White Grove “ for cellulose by-product. Reservoir diameter - 14 m, height 8,5 m. The inner side of entire reservoir was covered with concrete.

Production and assembling of the “White Grove” reservoir. Reservoir diameter is 6 m, height 8 m.

PRODUCTION OF STEEL CONSTRUCTIONS, DEVICES AND PIPE SPOOLS

„VITALES“d.o.o. Nova Bila

2007: Construction of a facility for production of biomass fuel. Construction and assembling of approx. 190 t steel construction and assembling and connecting various equipment (transporters, riddles, dispensers, mixers etc.)